
01
Gwalior shallow aquifer plan
PSI mapped groundwater from 3,000 water bodies. Surveys found 17 recharge sites. Three sites were chosen. Work has begun at two sites.
Projects
Short reads. Full reports can follow once PSI picks priority projects.

01
PSI mapped groundwater from 3,000 water bodies. Surveys found 17 recharge sites. Three sites were chosen. Work has begun at two sites.

02
Three water level sensors and rain gauges now watch the river. A colour coded dashboard shares alerts. The district authority helps pass warnings to families.

03
Teams study farm chemicals, water use and pollution in 12 villages. Village water testing has started in three villages.

04
PSI tested water at 10 sites on main bathing days. Most sites failed bathing standards. Tests found high organic waste and faecal bacteria.

05
PSI tested water at 36 points in Renuka Lake. Village, district and state groups now shape the protection plan.

06
PSI studied six watersheds and tested 103 water samples. Of 68 ponds, 39 held greywater. Pond renewal and roof rainwater harvesting were proposed.
Also in the drafts
District plans in Chamoli, Champawat and Tehri Garhwal: 253 training programmes and 7,132 panchayat resource persons sensitised.
Almora springs study: 52 traditional sources listed, 17 tracked. Hydropower benefit sharing: ten projects in five river basins. Climate and livelihood survey in the Song and Kosi basins, with IIT Roorkee. A 2023 flood loss survey in Kullu.
Each note sits in the source drafts for PSI to expand.